PEAK SHAVING CONSIDERING STREAMFLOW UNCERTAINTIES
DOI:
https://doi.org/10.4314/njt.141.419Abstract
The main thrust of this paper is peak shaving with a Stochastic hydro model. In peak sharing, the amount of hydro energy scheduled may be a minimum but it serves to replace less efficient thermal units. The sample system is die Kainji hydro plant and the thermal units of the National Electric Power Authority. The random nature of the system load is re-organized by using a Markov load model. The results include a modification of the expected load to be served by the array of thermal units, and the optimum schedule for the economic operation of the plant as a peaking load.
Downloads
Issue
Section
License
The contents of the articles are the sole opinion of the author(s) and not of NIJOTECH.
NIJOTECH allows open access for distribution of the published articles in any media so long as whole (not part) of articles are distributed.
A copyright and statement of originality documents will need to be filled out clearly and signed prior to publication of an accepted article. The Copyright form can be downloaded from http://nijotech.com/downloads/COPYRIGHT%20FORM.pdf while the Statement of Originality is in http://nijotech.com/downloads/Statement%20of%20Originality.pdf
For articles that were developed from funded research, a clear acknowledgement of such support should be mentioned in the article with relevant references. Authors are expected to provide complete information on the sponsorship and intellectual property rights of the article together with all exceptions.
It is forbidden to publish the same research report in more than one journal.