[1]
“AN INVESTIGATION OF TIME-COST-RISK TRADE-OFF IN THE INSTALLATION OF X-RAY MACHINE USING RESPONSE SURFACE METHODOLOGY”, NIJOTECH, vol. 33, no. 4, pp. 482–489, Sep. 2014, doi: 10.4314/njt.334.848.